{"id":11251,"date":"2021-05-24T17:53:09","date_gmt":"2021-05-24T15:53:09","guid":{"rendered":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/?p=11251"},"modified":"2021-05-24T17:53:09","modified_gmt":"2021-05-24T15:53:09","slug":"wattev","status":"publish","type":"post","link":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/2021\/05\/24\/wattev\/","title":{"rendered":"WattEV to Build First U.S. Megawatt Electric Truck"},"content":{"rendered":"<p style=\"text-align: justify;\"><i>Rendering: WattEV<\/i><\/p>\n<p style=\"text-align: justify;\"><b>The 110-acre truck stop, positioned near logistics fulfillment centers run by Amazon and Walmart in Bakersfield, California, will feature a solar micro-grid with battery storage, plus grid energy from PG&amp;E.<\/b><\/p>\n<p style=\"text-align: justify;\">An electric-vehicle infrastructure company has plans to build the first 25-megawatt, solar-powered, electric-only public truck stop in the U.S. to serve electric truck transport in California.<\/p>\n<p style=\"text-align: justify;\">WattEV is building an electric truck stop at a heavily truck-trafficked highway intersection in Bakersfield, located at the southern end of California\u2019s San Joaquin Valley. The 110-acre truck stop, positioned near logistics fulfillment centers run by Amazon and Walmart, will feature a solar micro-grid with battery storage, plus grid energy from Pacific Gas &amp; Electric.<\/p>\n<p style=\"text-align: justify;\">Partners in the project include the San Joaquin Valley Air Pollution Control District, Greenlots, Power Electronics, the Central California Asthma Collaborative, heavy-duty truck makers, PG&amp;E and others. Initial output from the WattEV electric truck stop will include 4-megawatt (MW) capability, eventually growing to 25-MW feeding more than 40 charging bays.<\/p>\n<p style=\"text-align: justify;\">WattEV also has developed a business model for the truck transport industry, labeled Trucks as a Service (TaaS), that opens the transition path for transporters to use battery-electric trucks.<\/p>\n<p style=\"text-align: justify;\">\u201cWe aim to enable the addition of 12,000 heavy-duty battery electric trucks to the roads in California by the end of 2030, exceeding existing forecasts,\u201d said WattEV CEO Salim Youssefzadeh in a press release. \u201cIf it works in California, it\u2019ll work just about anywhere in the country.\u201d<\/p>\n<p style=\"text-align: justify;\">WattEV has already reserved its first 50 <a href=\"https:\/\/www.truckinginfo.com\/10135619\/elon-musk-tesla-semi-ready-for-production-but-theres-a-snag\" target=\"_blank\" rel=\"noopener noreferrer\" data-feathr-click-track=\"true\">Tesla Semis<\/a> and plans to place more orders with other OEMs.<\/p>\n<p style=\"text-align: justify;\">\n<p>Originally posted on <a href=\"https:\/\/www.truckinginfo.com\/10143043\/wattev-to-build-first-u-s-megawatt-electric-truck-stop\" data-feathr-click-track=\"true\">Trucking Info<\/a><\/p>\n<p class=\"p-16-gray\">by <a href=\"https:\/\/www.fleetforward.com\/authors\/324937\/staff\" data-feathr-click-track=\"true\">Heavy Duty Trucking Staff<\/a><\/p>\n<div class=\"widget-see-also\">\n<p><span class=\"posted-by\">Source: <a href=\"https:\/\/www.fleetforward.com\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.fleetforward.com<\/a><\/span><\/p>\n<\/div>\n<div class=\"g-cols wpb_row type_default valign_top vc_inner vc_custom_1585038969469\">\n<div class=\"vc_col-sm-12 wpb_column vc_column_container\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"w-post-elm post_content\">\n<div class=\"g-cols wpb_row type_default valign_top vc_inner vc_custom_1585038969469\">\n<div class=\"vc_col-sm-12 wpb_column vc_column_container\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"w-post-elm post_content\">\n<div class=\"g-cols wpb_row type_default valign_top vc_inner vc_custom_1585038969469\">\n<div class=\"vc_col-sm-12 wpb_column vc_column_container\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"w-post-elm post_content\">\n<h3 style=\"text-align: center;\"><a href=\"https:\/\/advancedfleetmanagementconsulting.com\/eng\/consultancy\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>CUT COTS OF THE FLEET WITH OUR AUDIT PROGRAM<\/strong><\/a><\/h3>\n<p style=\"text-align: justify;\"><a href=\"https:\/\/advancedfleetmanagementconsulting.com\/eng\/consultancy\/\"><img loading=\"lazy\" class=\"wp-image-5377 aligncenter\" src=\"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-content\/uploads\/sites\/3\/2020\/04\/nueva-ley-auditoria.jpg\" sizes=\"(max-width: 858px) 100vw, 858px\" srcset=\"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-content\/uploads\/sites\/3\/2020\/04\/nueva-ley-auditoria.jpg 2000w, https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-content\/uploads\/sites\/3\/2020\/04\/nueva-ley-auditoria-300x200.jpg 300w, https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-content\/uploads\/sites\/3\/2020\/04\/nueva-ley-auditoria-1024x682.jpg 1024w\" alt=\"\" width=\"858\" height=\"572\" \/><\/a><\/p>\n<p style=\"text-align: justify;\">The audit is a key tool to know the overall status and provide the analysis, the assessment, the advice, the suggestions and the actions to take in order to cut costs and increase the efficiency and efficacy of the fleet. We propose the following fleet management audit.<\/p>\n<h3 style=\"text-align: center;\"><a href=\"https:\/\/advancedfleetmanagementconsulting.com\/eng\/consultancy\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>FLEET MANAGEMENT AUDIT<\/strong><\/a><\/h3>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Rendering: WattEV The 110-acre truck stop, positioned near logistics fulfillment centers run by Amazon and Walmart in Bakersfield, California, will feature a solar micro-grid with battery storage, plus grid energy from PG&amp;E. An electric-vehicle infrastructure company has plans to build the first 25-megawatt, solar-powered, electric-only public truck stop in the U.S. to serve electric truck&#8230;<\/p>\n","protected":false},"author":3,"featured_media":11252,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[18],"tags":[230],"_links":{"self":[{"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/posts\/11251"}],"collection":[{"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/comments?post=11251"}],"version-history":[{"count":1,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/posts\/11251\/revisions"}],"predecessor-version":[{"id":11253,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/posts\/11251\/revisions\/11253"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/media\/11252"}],"wp:attachment":[{"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/media?parent=11251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/categories?post=11251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/advancedfleetmanagementconsulting.com\/eng\/wp-json\/wp\/v2\/tags?post=11251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}